← Back to the foodservice equipment guide

Submittal.app

Foodservice Equipment Submittal Package Checklist

Project: __________________________

Submittal #: ____________________

Spec section(s): _________________

Date: __________________________

1 · Package document set

Every submittal package includes these, in this order.

  • Cover sheet — project, submittal number, spec section(s), date, and the submitting company
  • Transmittal — item list keyed to the schedule, with the reviewer/GC and the type (partial or full)
  • Table of contents / section dividers so the reviewer can navigate
  • Product data — manufacturer cut sheets marked to the exact model, options, and finish being furnished (strike what doesn't apply)
  • Shop drawings for anything fabricated or custom, matched to the drawings and schedules
  • Samples or physical mock-ups where the specification requires visual approval
  • Certifications & test reports the spec calls up (listings, ratings, compliance letters)
  • O&M data and warranties where required at this stage
  • Substitution request forms for any product not on the approved-manufacturer list

2 · Foodservice Equipment scope — by spec section

Pull a submittal for each section in your scope; confirm the spec's Part 1 list.

  • Equipment schedule: item number, description, maker, model, quantity and utility needs (voltage, phase, amps, water, waste, gas, exhaust)
  • A cut sheet for every item with the chosen model, options and accessories marked
  • Rough-in drawings showing the location, height and size of every plumbing, electrical, gas and exhaust connection
  • Shop drawings for custom stainless work: counters, sinks, tables and shelving, with materials and gauges
  • Kitchen hood shop drawings, coordinated with the hood fire suppression system and the exhaust fan
  • Walk-in cooler and freezer drawings: panel layout, doors, floors and the refrigeration system
  • Food safety and electrical listings for each item (such as NSF and UL) where the spec or health department requires them
  • Warranty, service and operation and maintenance data

3 · Before you submit — common rejection reasons to rule out

Reviewers flag these first. Verify each is not an issue before you send.

  • Cut sheets with options and accessories not marked
  • Rough-in drawings that do not match the MEP drawings for voltage, phase, gas size or drain locations
  • Item numbers that do not match the kitchen equipment plan
  • Hood drawings not coordinated with the fire suppression system or exhaust fan
  • Missing food safety or electrical listings that the spec or health department requires
  • Custom stainless drawings without materials, gauges or dimensions
  • Substitutions that change the utility needs without saying so

Free checklist from Submittal.app — the AI builder that assembles the whole package for you. submittal.app

Skip the checklist — let the AI build the package

Describe your foodservice equipment scope or upload the spec section. Submittal.app finds the cut sheets, assembles the package with a cover and transmittal, and lets you refine it in chat. First packages are free.

Build a foodservice equipment submittal free