1 · Package document set
Every submittal package includes these, in this order.
- Cover sheet — project, submittal number, spec section(s), date, and the submitting company
- Transmittal — item list keyed to the schedule, with the reviewer/GC and the type (partial or full)
- Table of contents / section dividers so the reviewer can navigate
- Product data — manufacturer cut sheets marked to the exact model, options, and finish being furnished (strike what doesn't apply)
- Shop drawings for anything fabricated or custom, matched to the drawings and schedules
- Samples or physical mock-ups where the specification requires visual approval
- Certifications & test reports the spec calls up (listings, ratings, compliance letters)
- O&M data and warranties where required at this stage
- Substitution request forms for any product not on the approved-manufacturer list
2 · Foodservice Equipment scope — by spec section
Pull a submittal for each section in your scope; confirm the spec's Part 1 list.
- Equipment schedule: item number, description, maker, model, quantity and utility needs (voltage, phase, amps, water, waste, gas, exhaust)
- A cut sheet for every item with the chosen model, options and accessories marked
- Rough-in drawings showing the location, height and size of every plumbing, electrical, gas and exhaust connection
- Shop drawings for custom stainless work: counters, sinks, tables and shelving, with materials and gauges
- Kitchen hood shop drawings, coordinated with the hood fire suppression system and the exhaust fan
- Walk-in cooler and freezer drawings: panel layout, doors, floors and the refrigeration system
- Food safety and electrical listings for each item (such as NSF and UL) where the spec or health department requires them
- Warranty, service and operation and maintenance data
3 · Before you submit — common rejection reasons to rule out
Reviewers flag these first. Verify each is not an issue before you send.
- Cut sheets with options and accessories not marked
- Rough-in drawings that do not match the MEP drawings for voltage, phase, gas size or drain locations
- Item numbers that do not match the kitchen equipment plan
- Hood drawings not coordinated with the fire suppression system or exhaust fan
- Missing food safety or electrical listings that the spec or health department requires
- Custom stainless drawings without materials, gauges or dimensions
- Substitutions that change the utility needs without saying so
Free checklist from Submittal.app — the AI builder that assembles the whole package for you. submittal.app