Back to the 28 46 00 guide

Submittal.app

Mass Notification Systems Submittal Checklist

CSI 28 46 00 · Division 28 — Electronic Safety & Security

Project: __________________________

Submittal #: ____________________

Spec section(s): _________________

Date: __________________________

1 · Package document set

Every submittal package includes these, in this order.

  • Cover sheet — project, submittal number, spec section(s), date, and the submitting company
  • Transmittal — item list keyed to the schedule, with the reviewer/GC and the type (partial or full)
  • Table of contents / section dividers so the reviewer can navigate
  • Product data — manufacturer cut sheets marked to the exact model, options, and finish being furnished (strike what doesn't apply)
  • Shop drawings for anything fabricated or custom, matched to the drawings and schedules
  • Samples or physical mock-ups where the specification requires visual approval
  • Certifications & test reports the spec calls up (listings, ratings, compliance letters)
  • O&M data and warranties where required at this stage
  • Substitution request forms for any product not on the approved-manufacturer list

2 · 28 46 00 Mass Notification Systems — what reviewers expect

Run the battery calcs at the spec's required margin (often 20–25%), not the code minimum — engineers check the math, and short margins are the most common Division 28 rejection.

  • Device data sheets for every initiating and notification device, all listed for the use
  • Battery calculations with the required standby and alarm margins
  • Voltage drop calculations for notification circuits
  • Riser diagram and point-to-point wiring details
  • Panel and power supply data with circuit capacities
  • Candela settings and synchronization for visual notification
  • Monitoring and off-premises connection details

Free checklist from Submittal.app — the AI builder that assembles the whole package for you. submittal.app

Skip the checklist — let the AI build the package

Describe your mass notification systems scope or upload the 28 46 00 spec section. Submittal.app finds the cut sheets, assembles the package with a cover and transmittal, and lets you refine it in chat. First packages are free.

Build a 28 46 00 submittal free