Landscape Submittal Package Checklist
Project: __________________________
Submittal #: ____________________
Spec section(s): _________________
Date: __________________________
1 · Package document set
Every submittal package includes these, in this order.
- Cover sheet — project, submittal number, spec section(s), date, and the submitting company
- Transmittal — item list keyed to the schedule, with the reviewer/GC and the type (partial or full)
- Table of contents / section dividers so the reviewer can navigate
- Product data — manufacturer cut sheets marked to the exact model, options, and finish being furnished (strike what doesn't apply)
- Shop drawings for anything fabricated or custom, matched to the drawings and schedules
- Samples or physical mock-ups where the specification requires visual approval
- Certifications & test reports the spec calls up (listings, ratings, compliance letters)
- O&M data and warranties where required at this stage
- Substitution request forms for any product not on the approved-manufacturer list
2 · Landscape scope — by spec section
Pull a submittal for each section in your scope; confirm the spec's Part 1 list.
- Plant list keyed to the plant schedule: botanical name, quantity, size (caliper, height, or container), condition (B&B vs. container), and nursery source
- Photos or certificates for specimen trees where the spec requires pre-tagging at the nursery
- Topsoil and planting mix: source and a soils lab analysis against the specified gradation, pH, and organic content; amendment and fertilizer data
- Mulch type and depth; edging and weed barrier
- Irrigation: backflow preventer, controller (with any smart/EPA WaterSense requirement), valves, heads and nozzles with radius/precip data, drip components, pipe and wire
- Hardscape unit pavers, sealers, and setting materials where in scope
- Site furnishings and exterior lighting cut sheets where carried in your contract
- Maintenance and establishment-period plan when the spec lists it as a submittal
3 · Before you submit — common rejection reasons to rule out
Reviewers flag these first. Verify each is not an issue before you send.
- Plant sizes below schedule (2" caliper submitted against a 2.5" schedule) or container sizes swapped without approval
- Soil submitted without a current lab analysis, or an analysis that misses the specified gradation and organic content
- Irrigation heads with precipitation rates mismatched within a zone
- Backflow preventer model not on the local jurisdiction's approved list
- Controller missing specified smart features (flow sensing, weather-based adjustment)
- No source identified for plant material, making pre-tagging impossible
Free checklist from Submittal.app — the AI builder that assembles the whole package for you. submittal.app
Skip the checklist — let the AI build the package
Describe your landscape scope or upload the spec section. Submittal.app finds the cut sheets, assembles the package with a cover and transmittal, and lets you refine it in chat. First packages are free.
Build a landscape submittal free