Lighting Submittal Package Checklist
Project: __________________________
Submittal #: ____________________
Spec section(s): _________________
Date: __________________________
1 · Package document set
Every submittal package includes these, in this order.
- Cover sheet — project, submittal number, spec section(s), date, and the submitting company
- Transmittal — item list keyed to the schedule, with the reviewer/GC and the type (partial or full)
- Table of contents / section dividers so the reviewer can navigate
- Product data — manufacturer cut sheets marked to the exact model, options, and finish being furnished (strike what doesn't apply)
- Shop drawings for anything fabricated or custom, matched to the drawings and schedules
- Samples or physical mock-ups where the specification requires visual approval
- Certifications & test reports the spec calls up (listings, ratings, compliance letters)
- O&M data and warranties where required at this stage
- Substitution request forms for any product not on the approved-manufacturer list
2 · Lighting scope — by spec section
Pull a submittal for each section in your scope; confirm the spec's Part 1 list.
- A cut sheet for every type on the fixture schedule, in schedule order, tagged with the type letter
- Full catalog logic decoded: lumen output, CCT, CRI, voltage, driver type (0-10V, DALI, DMX), options, and finish
- Photometric data (IES files or summary tables) when the spec or designer requires it
- Emergency lighting: battery packs, inverters, or generator-transfer devices with runtime and listing data
- Poles and bases for exterior fixtures, with EPA and wind-load data
- Controls: occupancy/vacancy sensors, dimmers, relay panels, network devices, plus a sequence of operations and zoning plan where specified
3 · Before you submit — common rejection reasons to rule out
Reviewers flag these first. Verify each is not an issue before you send.
- Catalog number incomplete or ordering matrix unmarked
- Wrong CCT or CRI versus the schedule (3500K submitted against a 3000K schedule)
- Dimming driver that doesn't match the control system protocol
- Substituted fixture without photometrics proving equivalent distribution
- Missing emergency listing (UL 924) on egress fixtures
- Exterior fixtures without the specified finish or without pole EPA calculations
Free checklist from Submittal.app — the AI builder that assembles the whole package for you. submittal.app
Skip the checklist — let the AI build the package
Describe your lighting scope or upload the spec section. Submittal.app finds the cut sheets, assembles the package with a cover and transmittal, and lets you refine it in chat. First packages are free.
Build a lighting submittal free