Ames Fire & WaterworksAutomatic Control Valve 972GD-19972GD-19
Ames Fire & Waterworks On-Off Float Control Valve (970 Series). Model 972GD-19. Pilot operated diaphragm valve; Closes drip-tight at high-level setpoint; Opens fully at low-level setpoint; Single diaphragm actuated. material: Ductile Iron ASTM A536, CF8M (316) Stainless Steel, Nylon Reinforced Buna-N
Free to start · No card required · The agent pulls this cut sheet in automatically
- Manufacturer
- Ames Fire & Waterworks
- Catalog no.
- 972GD-19
- Product type
- Plumbing
- MasterFormat
- 22
- Cut sheet
- PDF · manufacturer current
Product details
| Catalog number | 972GD-19 |
|---|---|
| Description | Ames Fire & Waterworks On-Off Float Control Valve (970 Series). Model 972GD-19. Pilot operated diaphragm valve; Closes drip-tight at high-level setpoint; Opens fully at low-level setpoint; Single diaphragm actuated. material: Ductile Iron ASTM A536, CF8M (316) Stainless Steel, Nylon Reinforced Buna-N |
| Connection size | 6" and Larger |
| Finish | NSF 61 Certified Epoxy Coating |
| Mounting | Globe or Angle Pattern |
| Compliance | NSF 61. |
Also cataloged as: 672GD-19, 972AD-19, 672AD-19
- Official cut sheet, indexed
- Auto-matched to your schedule
- Cover + TOC, one click
From fixture schedule to submittal in minutes.
How the Builder works →- 01
Describe the job
Paste a fixture schedule, upload a spec section, or just list catalog numbers and quantities.
- 02
The agent matches & assembles
Products are matched from the indexed library and current cut sheets are pulled into a formatted package with cover and TOC.
- 03
Share for review
Send one link for sign-off, then roll the approved package into a quote or PO without retyping a part number.
More from Ames Fire & Waterworks
All 604 cut sheets →- 600GDCut sheet · PDF →
- 600GD-16Cut sheet · PDF →
- 600GS-16Cut sheet · PDF →
- 900GDCut sheet · PDF →
- 900GD-16Cut sheet · PDF →
- 910Cut sheet · PDF →
Put the 972GD-19 in a submittal package.
Describe the job and the AI agent builds the whole package — cut sheets pulled, schedule matched, cover and TOC included.
