EatonBussmann Series Cubefuse Compact Circuit Protector BaseCCP2B
Eaton Compact Circuit Protector Base (Bussmann Series Cubefuse). Model CCP2B. Amp ratings: 15, 20, 30, 40, 50, 60, 70, 90, and 100 A
Free to start · No card required · The agent pulls this cut sheet in automatically
- Manufacturer
- Eaton
- Catalog no.
- CCP2B
- Product type
- Electrical
- MasterFormat
- 26
- Cut sheet
- PDF · manufacturer current
Product details
| Catalog number | CCP2B |
|---|---|
| Description | Eaton Compact Circuit Protector Base (Bussmann Series Cubefuse). Model CCP2B. Amp ratings: 15, 20, 30, 40, 50, 60, 70, 90, and 100 A |
| Poles | 1-, 2-, and 3-pole versions; Short-circuit current rating: 200 kA |
| Features | Patented amp rating rejection, open fuse indication lamp, built-in switch/fuse interlock. endConnection: Lineside bolt-on bus connector, Loadside box lug terminal, Loadside fork terminal |
| Mounting | Bolt-mounted design fits into Quik-Spec Coordination Panelboard bus |
| Compliance | UL 98 Listed, cULus, RoHS compliant, CE, IEC 60947-3 AC-21A |
| Voltage | 600 Vac, 125 Vdc. |
Also cataloged as: CCP2B-1-15CF, CCP2B-2-15CF, CCP2B-3-15CF, CCP2B-1-20CF, CCP2B-2-20CF, CCP2B-3-20CF, CCP2B-1, CCP2B-2, CCP2B-3, CCP2B-15, CCP2B-20, CCP2B 1, CCP2B 2, CCP2B 3, CCP2B 15CF, CCP2B 20CF, CCP2B 30CF, CCP2B 40CF, CCP2B 50CF, CCP2B 60CF, CCP2B 70CF, CCP2B 90CF, CCP2B 100CF
- Official cut sheet, indexed
- Auto-matched to your schedule
- Cover + TOC, one click
From fixture schedule to submittal in minutes.
How the Builder works →- 01
Describe the job
Paste a fixture schedule, upload a spec section, or just list catalog numbers and quantities.
- 02
The agent matches & assembles
Products are matched from the indexed library and current cut sheets are pulled into a formatted package with cover and TOC.
- 03
Share for review
Send one link for sign-off, then roll the approved package into a quote or PO without retyping a part number.
More from Eaton
All 8785 cut sheets →- hiddenCut sheet · PDF →
- STE1B-050-HT2-S756VCut sheet · PDF →
- TL3-POE-KPADCut sheet · PDF →
- STH-4R-ELSTC-FCut sheet · PDF →
- GHG 627 7.. R....Cut sheet · PDF →
- Ats 16 And Ats 30Cut sheet · PDF →
Put the CCP2B in a submittal package.
Describe the job and the AI agent builds the whole package — cut sheets pulled, schedule matched, cover and TOC included.