Alerton Cut Sheets & Submittal Packages
Our library covers 13 Alerton cut sheets and spec sheets. Instead of hunting through manufacturer sites, tell the Submittal Builder what the spec calls for and it assembles the Alerton package — cover page, cut sheets, and all.
Sample Alerton Documents
A few of the 13 Alerton spec sheets and cut sheets in the library.
WEBs HMI Touchscreen Monitor - Installation Instructions
Microtouch Wall Sensor Datasheet
VN Series Zone Valves Guide Spec
VN SERIES ZONE VALVES Installation Instructions
Fiche technique des vannes de zone de la serie VN
VN Series Zone Valves DataSheet
ACM Niagara N4 Compatibility
AXM Installation and Operations Guide
How It Works
From schedule to submittal package in minutes, not days.
Describe your schedule
Paste a fixture schedule, upload a spec section, or just tell the Submittal Builder what the job calls for — catalog numbers, Alerton series, quantities.
AI matches products & assembles the package
The agent matches Alerton products from our indexed library, pulls the current cut sheets, and assembles a formatted submittal package with a cover page and table of contents.
Share, quote, PO
Send a review link to the design team, then turn the approved package into quotes and purchase orders without retyping a single part number.
Frequently Asked Questions
What's in a Alerton submittal package?
A typical Alerton submittal package includes a cover page, a table of contents, and the manufacturer cut sheet or spec sheet for every Alerton product on the schedule, with the specified catalog numbers highlighted. Submittal assembles all of it automatically and keeps part numbers consistent from spec to submittal to purchase order.
How do I get Alerton cut sheets?
You can search our index of 13 Alerton spec sheets by part number or product name — or skip the searching entirely and have the Submittal Builder match your schedule and attach the right Alerton cut sheets automatically.
Can I substitute Alerton products in my submittal?
Yes. When a specified Alerton item has a long lead time or is discontinued, the Submittal Builder can propose equivalent alternatives, pull their cut sheets, and flag the substitution in the package so the design team can approve it cleanly.
How long does a Alerton submittal take with Submittal?
Most packages come together in a few minutes. The agent reads your schedule, matches it against 13 indexed Alerton documents, and hands back a formatted submittal that's ready to share for review.
Build Your Next Alerton Submittal in Minutes
Sign up free and turn your next Alerton schedule into a finished submittal package today.