How Many Submittals Are on a Construction Project?

Quick Answer

It scales with project complexity more than dollar value: a small tenant improvement might carry 30-75 submittal line items, a mid-size commercial building 300-800, and complex institutional work — hospitals, labs, airports — routinely exceeds 1,500 and can pass several thousand including resubmittals and closeout. Counting revisions, the number of review events is typically 1.3-1.5× the register count.

What actually drives the count

The register size is set by how many spec sections the project carries and how demanding each one is. The multipliers that push counts up:

  • MEP intensity: hospitals and labs carry huge Division 21-28 scopes — equipment, controls, med-gas, low voltage — each with data, drawings, and closeout lines
  • Finish variety: every flooring type, tile, and paint system adds product data plus samples
  • Delegated design: sprinklers, curtain wall, trusses, and anchorage each add engineered packages and often AHJ legs
  • Owner standards: institutional owners add informational submittals (warranties, training, spare parts) per section
  • Sustainability programs: LEED documentation adds a line to most product submittals
  • Public work: agencies commonly require submittals on items private jobs would wave through, including mix designs and certifications for commodity materials

Benchmarks by project type

Rules of thumb that hold up reasonably well in practice:

  • Tenant fit-out / small commercial: 30-75 register lines
  • Mid-size office, retail, multifamily: 200-500
  • K-12 school or mid-size municipal building: 400-900
  • Full-service hospital, laboratory, airport terminal: 1,500-4,000+
  • Add 30-50% to any of these for total review events once resubmittals are counted

Why the count matters before day one

The register size sets the review pipeline load, and the pipeline has a fixed width: a design team that comfortably turns 20 packages a week drowns when 80 arrive in week three. That is why sequencing beats volume — long-lead procurement items first, finishes later — and why the submittal schedule required by Division 01 is worth building honestly instead of copying from the last job. For subs, the count is also a staffing signal: a 600-line register hitting three of your trades means someone owns package production as a real job for two months, not as evenings.

Managing volume without drowning

Volume is a logistics problem, and logistics automate. Submittal.App generates the register from spec sections, assembles packages from schedules in minutes, and keeps statuses current as a side effect of sending and receiving — so a 500-line register is a dashboard, not a part-time job. The teams that struggle with submittal volume are almost never short on knowledge; they are short on hours, and hours are what assembly automation returns.

One more sizing note for subs quoting a new project: count your sections before you price the general conditions. The gap between a 12-section scope and a 30-section scope is hundreds of hours of documentation labor across submittals, resubmittals, and closeout — real cost that belongs in the number, not absorbed as overtime later, and a line worth defending when the GC questions it.

Related Questions

Do resubmittals count as new submittals in the log?

They stay on the same line as incremented revisions — but each revision is a full review event for scheduling purposes. Registers that ignore revision volume underestimate the review pipeline by a third.

How many submittals should go in during the first month?

The long-lead set — gear, elevators, major equipment, deferred-design starts — which is usually 10-20% of the register. Flooding the reviewer with the whole register in week two produces a queue exactly where you need speed.

Who decides what requires a submittal on a project?

The specifiers — each spec section's Part 1 lists its required submittals, and Division 01 sets procedure. The GC can add internal requirements, but the contractual list comes from the specs.

Do design-build projects have fewer submittals?

Often somewhat fewer formal external cycles, since designer and builder sit on the same team and can resolve selections collaboratively — but the documentation still exists for permitting, QA, and closeout. The work changes shape more than size.