22 40 00
Plumbing Fixtures: submittal requirements
Plumbing submittals cover fixtures, piping, valves, and equipment — and reviewers check them against both the spec and the code (lead-free, water conservation, backflow). Complete schedules keyed to the drawings move fastest.
What reviewers expect in a plumbing fixtures package
- Fixture product data keyed to the plumbing fixture schedule (P-tags)
- Flow rates and water-conservation compliance for each fixture
- Lead-free certification (NSF/ANSI 372) for potable water components
- Pipe and fitting data by service — material, schedule/type, joining method
- Valve schedule with pressure class and end connections
- Water heater data with input, recovery, efficiency, and venting
- Backflow preventer data with approval listings for the hazard level
Field tip
Organize the package by the fixture schedule, not by manufacturer — a reviewer who can walk P-1 through P-12 in order approves in one pass.
Manufacturers we see in 22 40 00 packages
From our catalog of 335,000+ products with data sheets: 22,068 plumbing fixtures products across 23manufacturers. The spec's approved list always governs.
- Savona Bidet — American Standard
- Elkay Vandal — Elkay
- Elkay Vandal — Elkay
- Elkay CSLCBP — Elkay
Build this package in minutes
Tell the builder what your plumbing fixtures scope needs — or upload the 22 40 00 spec — and it finds the cut sheets, assembles the package with a cover and transmittal, and lets you refine it in chat. First packages are free.
Build a 22 40 00 submittal freeCommon questions
What goes in a 22 40 00 plumbing fixtures submittal?
Product data sheets for every item in the section, keyed to the drawings or schedules, plus whatever the spec's Part 1 lists — commonly shop drawings, samples, certifications, and warranty terms. The checklist above covers what reviewers look for first.
Which manufacturers are common in 22 40 00 packages?
Across our catalog we hold 22,068 plumbing fixtures products from 23 manufacturers, led by Chicago Faucets, Elkay, American Standard. The spec's approved-manufacturer list always governs — check Part 2 before you commit.
How do I build this package faster?
Describe the scope to the Submittal.app builder or upload the spec section — it finds the cut sheets, assembles the package with a cover and transmittal, and lets you refine everything in chat. First packages are free.