Watts
Watts Overflow Roof Drain (Roof Drain). Model RD-200-R. Includes self-locking polyethylene dome (standard); Integral 2" (51 mm) high external water dam; Free area 35 sq. in. for 2" pipe size; Optional body materials include PVC, ABS, and Galvanized. material: Epoxy coated cast iron
Free to start · No card required · The agent pulls this cut sheet in automatically
- Manufacturer
- Watts
- Catalog no.
- Product type
- Plumbing
- MasterFormat
- 22
- Cut sheet
- PDF · manufacturer current
Product details
| Catalog number | |
|---|---|
| Description | Watts Overflow Roof Drain (Roof Drain). Model RD-200-R. Includes self-locking polyethylene dome (standard); Integral 2" (51 mm) high external water dam; Free area 35 sq. in. for 2" pipe size; Optional body materials include PVC, ABS, and Galvanized. material: Epoxy coated cast iron |
| Connection size | 2" (51 mm) standard, 3" (76 mm), 4" (102 mm) options |
| End connection | No Hub (MJ), Push On, Threaded, Inside Caulk, PVC/ABS Socket |
| Finish | Epoxy coated |
| Mounting | Flashing clamp, integral 2" high external water dam |
| Dimensions | 88 1/8" (206 mm) diameter, 55 5/16" (135 mm) height, 6 1/2" (165 mm) dec |
- Official cut sheet, indexed
- Auto-matched to your schedule
- Cover + TOC, one click
From fixture schedule to submittal in minutes.
How the Builder works →- 01
Describe the job
Paste a fixture schedule, upload a spec section, or just list catalog numbers and quantities.
- 02
The agent matches & assembles
Products are matched from the indexed library and current cut sheets are pulled into a formatted package with cover and TOC.
- 03
Share for review
Send one link for sign-off, then roll the approved package into a quote or PO without retyping a part number.
More from Watts
All 3687 cut sheets →- LF223Cut sheet · PDF →
- 6G-15Cut sheet · PDF →
- NumberCut sheet · PDF →
- 215Cut sheet · PDF →
- CSM-81-FCut sheet · PDF →
- LF215Cut sheet · PDF →
Put the in a submittal package.
Describe the job and the AI agent builds the whole package — cut sheets pulled, schedule matched, cover and TOC included.
